Millrock Grants Right Of First Refusal To Major Mining Company Concerning Alaska Peninsula Copper-Gold Project, Alaska

VANCOUVER, BRITISH COLUMBIA, January 27, 2014 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock" or “the Company") announces that it has entered into a Binding Letter Agreement with First Quantum Minerals Ltd. (“FQM”) whereby the Company has granted an exclusive right  to enter into an Option to Joint Venture Agreement concerning the Alaska Peninsula Project, located in southwest Alaska.  In consideration of the exclusive right grant, FQM will fund an initial exploration program estimated to cost US$600,000.  The program is planned to consist of regional geochemical sampling, geological mapping, prospecting and airborne magnetic surveys, which are to be carried out in summer of 2014 by Millrock.  FQM may also elect to increase the expenditure to fund drilling of several holes.  Subject to exercise of the exclusive right by November 30, 2014, FQM will have an option to earn up to an 80% joint venture interest in the property through a two-stage option agreement. Gregory Beischer, President & CEO of Millrock, stated, “We are pleased to be able to advance this project with a new major mining company partnership.  Our staff looks forward to performing systematic exploration and making great discoveries on these lands.  It is important to understand the scale of this project.  The land package exceeds 200,000 hectares.  This is the sort of district-scale exploration project at which Millrock excels”.

The Alaska Peninsula project is comprised of mineral lands owned by Bristol Bay Native Corporation.  Millrock has previously made an Exploration Agreement with Option to Lease through which it can secure a 100% leasehold interest for mining (click here to view press release).  The agreement covers a tract of land that covers three known porphyry copper-gold occurrences on the Alaska Peninsula.  The village of Chignik is located roughly central to the land package which is more than 120 km long and up to 60 km wide and covers an area of approximately 650,000 ha.  The known porphyry occurrences are named Kawisgag, Mallard Duck Bay and Bee Creek which are located near deep tidewater coastlines.

At the Kawisgag prospect, targets are immediately ready to drill.  There are two main centers of mineralization and alteration which locally contain disseminated and vein-hosted chalcopyrite, molybdenite and pyrite at surface.

The Mallard Duck Bay prospect is a zone of hydrothermal alteration covering an area greater than fifteen square km.  The zone has seen very limited exploration, but mineralization appears to be associated with a diorite stock.  A strong chargeability anomaly coincident with exposed mineralization in a potassic alteration zone was identified by prior workers, but never drilled.

Mineralization at the Bee Creek prospect is hosted in hornfelsed sediments intruded by a multiphase diorite intrusive rock containing mineralized veins and disseminated chalcopyrite, molybdenite and pyrite.  A broad, central, potassic alteration zone bordered by a discontinuous halo of phyllic alteration is exposed at surface.  The prospect was initially explored by Bear Creek Mining with five drill holes in 1976.  In 2005 and 2006, Metallica Resources Inc. and Full Metal Minerals Ltd. carried out geochemical and geophysical surveys, and drilled two holes.  One of the holes intersected 118 m averaging 0.31% Cu, 0.009% Mo and 0.126 ppm Au with 20 m of 0.66% Cu and 0.255 ppm Au (see Full Metal Minerals news release dated October, 23, 2006 entitled “Full Metal and Metallica Encounter Copper Mineralization at Bee Creek” under their SEDAR profile, at www.SEDAR.com).  Mineralization, alteration and anomalous copper values in soils and rocks extend over a broad area at the Bee Creek prospect indicating the potential for a significant porphyry Cu-Mo-Au deposit near surface.  A qualified person has not fully verified the data disclosed in this paragraph for Millrock.

In addition to these three known prospects, the region is prospective for porphyry copper-gold-molybdenum systems and other intrusive-related deposits such as polymetallic skarn and replacement deposits, base metal veins and epithermal gold deposits.  However, very little exploration has been done.  A more detailed description of the lands with maps can be viewed at the following link.

The technical information within this document has been reviewed and approved by Gregory A. Beischer, President & CEO of Millrock.  Mr. Beischer is a Qualified Person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC.
Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class metallic mineral deposits in mineral-rich Alaska and southwest USA, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk taken on by most exploration companies.  Millrock currently has nine active exploration projects, seven gold-copper properties in Alaska, and two porphyry copper prospects in Arizona. Funding for Millrock’s exploration projects primarily comes from its joint venture partners.  Business partners of Millrock include some of the leading names in the mining industry: Teck, First Quantum and Altius.

FOR FURTHER INFORMATION, PLEASE CONTACT
Gregory A. Beischer, President & CEO
Phone: (604) 638-3164
Toll Free: (877) 217-8978

Millrock Resources Inc.
800 – 789 West Pender Street
Vancouver, BC V6C 1H2
Canada

FORWARD LOOKING STATEMENTS
Some statements in this news release contain forward-looking information. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE."

Millrock Reports on Exploration Results and Right of First Refusal, Stellar Copper-Gold Project, Alaska

VANCOUVER, BRITISH COLUMBIA, November 11, 2013 - On August 6, 2013 Millrock Resources Inc. (TSXV:MRO) reported that it had granted a Right of First Refusal (ROFR) to a major mining company (“the Miner”).  In return for the ROFR the Miner agreed to fund a minimum of US$200,000 worth of exploration work. The exploration work was completed during August 2013 and consisted of 1) airborne magnetic, electromagnetic and radiometric surveys(~950 line km), 2) property-wide soil geochemical surveys on 500 m centers (792 samples), and 3) rock sampling (198 samples).  Additionally, 452 rock samples were collected at a majority of soil sample sites and a hand-held spectrometer was used to analyze the specimens, primarily for the presence of hydrothermal alteration minerals.  The surveys were designed to provide a property-scale data set with which to assess the property’s overall potential to host a large-scale copper-gold deposit.

Broad scale copper anomalies were identified by the soil geochemical survey and there is evidence for widespread hydrothermal activity.  Three areas of particular anomalism –Jupiter, Mars and Gemini – are evident.

The Jupiter target area lies along the northern margin of the same diorite stock that occurs adjacent to and possibly responsible for the formation of the Zackly copper-gold skarn deposit located two km to the southeast.  The area is underlain almost entirely by andesite and basalt commonly exhibiting albite and chlorite alteration.  The Jupiter multi-element geochemical anomaly measures 2.3 km by 1.7 km and occurs with a corresponding magnetic high.  The anomaly consists of 33 soil samples with copper results range between 246 ppm to 3850 ppm and have an average copper value of 832 ppm.  Gold values in these soil samples average 92 ppb and range from 5 ppb to 178 ppb.  In addition to high copper and gold the soils contain anomalous silver and cobalt.  The anomaly is lineated to the NNE and the WNW and seems to be formed along an offset structural intersection.

Additional sampling at the previously identified Mars prospect better defined the geochemical anomalous zone discovered in 2012.  The soil anomaly is based on 28 samples and measures approximately 1.4 km by 0.8 km.  The area is characterized by strong copper-in-soil values, along with anomalous molybdenum and gold, centered on a magnetic high. Copper values within the anomaly range from 258 ppm to 3510 ppm and averaging 977 ppm copper.  Gold values range from 38 ppb to 339 ppb and average 116 ppb.  The anomaly is underlain by locally altered andesite, basalt, gabbro and diorite in a structurally complex setting.  Rock grab samples of altered bedrock and float were collected from the prospect.  Seven of those samples assayed over 1% copper with values up 7.4% Cu and up to 1.78 ppm Au.

The Gemini target area is a newly discovered anomaly generated in the recent exploration program.  It is a strong copper-in-soil anomaly centered on a chlorite (+skarn +potassic) alteration zone in andesite and basalt.  The anomaly is defined by 12 samples over an area measuring 3.0 km by 1.8 km with copper values ranging from 356 ppm to 1130 ppm and averaging 568 ppm copper.

Despite the results, the Miner has elected not to exercise its ROFR.  The property remains available for earn-in agreements with other companies.  In addition to the target areas described above, the Zackly skarn remains a strong target for further exploration.  See press release issued September 19, 2012 for a description of this prospect.

The technical information within this document has been reviewed and approved by Gregory A. Beischer, President & CEO of Millrock Resources Inc. Mr. Beischer is a qualified person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC.
Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class metallic mineral deposits in mineral-rich Alaska and southwest USA, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk taken on by most exploration companies.  Millrock currently has nine active exploration projects, seven copper-gold properties in Alaska, and two porphyry copper prospects in Arizona. Funding for Millrock’s exploration projects primarily comes from its joint venture partners.  Business partners of Millrock include some of the leading names in the mining industry: Teck, First Quantum and Altius.

FOR FURTHER INFORMATION, PLEASE CONTACT
Gregory A. Beischer, President & CEO
Phone: (604) 638-3164
Toll Free: (877) 217-8978

Millrock Resources Inc.
750 World Trade Centre - 999 Canada Place
Vancouver, BC  V6C 3E1
Canada

FORWARD LOOKING STATEMENTS
Some statements in this news release contain forward-looking information. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE."

Correction: Closing of Private Placement

VANCOUVER, BRITISH COLUMBIA, October 11, 2013 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock" or “the Company") makes a correction as to the number of units reported in the news release dated October 9, 2013.  The Company has arranged and closed a non-brokered private placement whereby a total of 6,700,000 units (not 7,600,000 units as previously disclosed) at a price of $0.0675 per unit have been issued for gross proceeds of $452,250.  Each unit consists of one common share of Millrock and one share purchase warrant (the “Warrants”), with each Warrant entitling the holder thereof to purchase one additional common share at a price of $0.15 per share for a period of five years until October 10, 2018. The private placement contains an acceleration clause whereby should the shares of the Company trade at $0.21 or more for more than 30 consecutive trading days, the Company has the right to force exercise of the share purchase warrants by providing notice to the warrantholder.  The warrantholder will have 30 trading days to exercise the share purchase warrants or they will be forfeited.

Proceeds from the financing will be used for project generation and general corporate purposes. The financing is subject to final approval from the TSX Venture Exchange.

ABOUT MILLROCK RESOURCES INC.
Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class metallic mineral deposits in mineral-rich Alaska and southwest USA, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has ten active exploration projects, seven gold-copper properties in Alaska, and three porphyry copper prospects in Arizona. Funding for Millrock’s exploration projects primarily comes from its joint venture partners.  Business partners of Millrock include some of the leading names in the mining industry: Teck, First Quantum and Altius.

FOR FURTHER INFORMATION, PLEASE CONTACT
Gregory A. Beischer, President & CEO
Phone: (604) 638-3164
Toll Free: (877) 217-8978

Millrock Resources Inc.
750 World Trade Centre - 999 Canada Place
Vancouver, BC  V6C 3E1
Canada

FORWARD LOOKING STATEMENTS
Some statements in this news release contain forward-looking information. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE."

Millrock Announces Private Placement

VANCOUVER, BRITISH COLUMBIA, October 9, 2013 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock" or “the Company") has arranged and closed a non-brokered private placement.  A total of 7,600,000 units at a price of $0.0675 per unit have been issued for gross proceeds of $452,250.  Each unit consists of one common share of Millrock and one share purchase warrant (the “Warrants”), with each Warrant entitling the holder thereof to purchase one additional common share at a price of $0.15 per share for a period of five years until October 10, 2018. The private placement contains an acceleration clause whereby should the shares of the Company trade at $0.21 or more for more than 30 consecutive trading days, the Company has the right to force exercise of the share purchase warrants by providing notice to the warrantholder.  The warrantholder will have 30 trading days to exercise the share purchase warrants or they will be forfeited.

Proceeds from the financing will be used for project generation and general corporate purposes. The financing is subject to final approval from the TSX Venture Exchange.

ABOUT MILLROCK RESOURCES INC.
Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class metallic mineral deposits in mineral-rich Alaska and southwest USA, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has ten active exploration projects, seven gold-copper properties in Alaska, and three porphyry copper prospects in Arizona. Funding for Millrock’s exploration projects primarily comes from its joint venture partners.  Business partners of Millrock include some of the leading names in the mining industry: Teck, First Quantum and Altius.

FOR FURTHER INFORMATION, PLEASE CONTACT
Gregory A. Beischer, President & CEO
Phone: (604) 638-3164
Toll Free: (877) 217-8978

Millrock Resources Inc.
750 World Trade Centre - 999 Canada Place
Vancouver, BC  V6C 3E1
Canada

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”

Millrock Grants Right of First Refusal to Major Mining Company Concerning Stellar Copper-Gold Project, Alaska

VANCOUVER, BRITISH COLUMBIA, August 6, 2013 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock" or “the Company") announces that it has entered into a Letter Agreement with a major international mining company – one of the world’s leading copper producers - (“the Miner”) whereby the Company will grant a right of first refusal (“ROFR”) to the Miner to enter into an Option and Joint Venture Agreement concerning the Stellar Project, Alaska.  In consideration of the ROFR, the Miner will fund an initial exploration program estimated to cost US$200,000.  The program will consist of regional geochemical sampling, geological mapping and prospecting, which will be carried out in August 2013 by Millrock.  Subject to exercise of the ROFR by October 31, 2013, the Miner will have an option to earn up to an 80% joint venture interest in the property through a two-stage option agreement. The Stellar project is located in central Alaska 13 km north of the Denali Highway and 68 km west of the town of Paxson. The property, which Millrock acquired by staking in 2012, covers the Zackly copper-gold skarn deposit.  Surrounding lands are considered prospective for porphyry copper-gold deposits, or other types of copper deposits and intrusion-related gold deposits.  Millrock owns a 100% interest in the claims subject to a royalty payable to Altius Minerals Ltd.

The technical information within this document has been reviewed and approved by Gregory A. Beischer, President & CEO of Millrock.  Mr. Beischer is a Qualified Person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC.
Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class metallic mineral deposits in mineral-rich Alaska and southwest USA, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has ten active exploration projects, seven gold-copper properties in Alaska, and three porphyry copper prospects in Arizona. Funding for Millrock’s exploration projects primarily comes from its joint venture partners.  Business partners of Millrock include some of the leading names in the mining industry: Teck, First Quantum and Altius.

FOR FURTHER INFORMATION, PLEASE CONTACT
Gregory A. Beischer, President & CEO
Phone: (604) 638-3164
Toll Free: (877) 217-8978

Millrock Resources Inc.
750 World Trade Centre - 999 Canada Place
Vancouver, BC  V6C 3E1
Canada

FORWARD LOOKING STATEMENTS
Some statements in this news release contain forward-looking information. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE."

Millrock Shareholders Approve Alteration Of Articles To Include Advance Notice Provision

VANCOUVER, BRITISH COLUMBIA, June 12, 2013 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock" or “the Company") announces that the Company is proceeding with an alteration of its Articles to include advance notice provisions relating to the nomination of individuals for election of directors.  These provisions are designed to: (i) facilitate orderly and efficient shareholder meetings at which directors are to be elected; (ii) ensure that all shareholders, including those participating in a shareholders’ meeting by proxy rather than in person, receive adequate notice of all director nominations and sufficient information with respect to all nominees; and (iii) allow shareholders to register an informed vote.  This alteration of the Company’s Articles was approved by shareholders at the Company’s annual general meeting held on June 10, 2013.

ABOUT MILLROCK RESOURCES INC.
Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class metallic mineral deposits in mineral rich Alaska and southwest USA, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has eleven active exploration projects, seven gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock projects that it will carry out exploration programs with a total value of more than US$5M in 2013.  Business partners of Millrock include some of the leading names in the mining industry: Teck, First Quantum and Altius.

FOR FURTHER INFORMATION, PLEASE CONTACT
Gregory A. Beischer, President & CEO
Phone: (604) 638-3164
Toll Free: (877) 217-8978

Millrock Resources Inc.
750 World Trade Centre - 999 Canada Place
Vancouver, BC  V6C 3E1
Canada

FORWARD LOOKING STATEMENTS
Some statements in this news release contain forward-looking information. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE."

Millrock and First Quantum Report on Drilling at the Dry Mountain Project, Safford Copper District, Arizona

VANCOUVER, BRITISH COLUMBIA, May 10, 2013 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock" or “the Company") reports that a single drill hole has been completed at its Dry Mountain project in Arizona. The project is a joint venture between Millrock and First Quantum Minerals Ltd. (“First Quantum”, TSX Symbol “FM”, LSE Symbol “FQM”) following First Quantum’s recent acquisition of Inmet Mining Corporation.  The hole was completed to a depth of 1,165.9 m to test for a porphyry copper deposit buried beneath Quaternary alluvium and Tertiary cover rocks.  The favourable Laramide rocks were intersected at approximately 900 m below surface.  No copper mineralization was intersected and no evidence of hydrothermal alteration of significance was observed. The Dry Mountain project is located at the southwestern end of the Morenci porphyry copper trend. The trend is defined by structural features, and a series of magmatic intrusive complexes identified in bedrock and traced by geophysical methods under post-mineralization volcanic cover and alluvium. A copper + molybdenum biogeochemistry anomaly at Dry Mountain measures five kilometers by six kilometers.  The anomaly indicates the potential for a large buried porphyry copper deposit. The Dry Mountain geochemical anomaly is the southernmost in a string of significant anomalies that starts at the Safford deposits, large porphyry copper deposits that are being mined by Freeport-McMoRan Copper & Gold.  Gravity data defines a regional pre-mineral basement high. The recently completed drill hole pierced the rocks below the anomaly but did not explain it.  Therefore, Millrock interprets that the geochemical anomaly is derived from a remote bedrock source.  Millrock and First Quantum will evaluate the results in context of the prior exploration work accomplished and determine the next step forward.

The technical information within this document has been reviewed and approved by Gregory A. Beischer, President & CEO of Millrock Resources Inc. Mr. Beischer is a Qualified Person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC.
Millrock Resources Inc. is a premier project generator to the mining industry. In the search for world-class gold and copper deposits in mineral rich Alaska and southwest USA, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies. Millrock currently has eleven active exploration projects, seven gold-copper properties in Alaska, and four porphyry copper prospects in Arizona. With funding primarily coming from its joint venture partners, Millrock projects that it will carry out exploration programs with a total value of more than US$5M in 2013. Business partners of Millrock include some of the leading names in the mining industry: Teck, First Quantum and Altius.

FOR FURTHER INFORMATION, PLEASE CONTACT
Gregory A. Beischer, President & CEO
Phone: (604) 638-3164
Toll Free: (877) 217-8978

Millrock Resources Inc.
750 World Trade Centre - 999 Canada Place
Vancouver, BC  V6C 3E1
Canada

FORWARD LOOKING STATEMENTS
Some statements in this news release contain forward-looking information. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE."

Millrock Makes Exploration Agreement with Bristol Bay Native Corporation, Alaska Peninsula, Alaska

VANCOUVER, BRITISH COLUMBIA, May 7, 2013 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock") is pleased to announce that it has made an exploration and option to lease agreement with Bristol Bay Native Corporation (“BBNC”).  The agreement covers a tract of land that covers three known porphyry copper-gold occurrences on the Alaska Peninsula.  The village of Chignik is located roughly central to the land package which is more than 140 km long and 90 km wide and covers an area of approximately 650,000 ha.  The known porphyry occurrences are named Kawisgag, Mallard Duck Bay and Bee Creek and these are located near deep tidewater coastlines. Gregory Beischer, President & CEO of Millrock, stated, “This agreement gives Millrock access to a very large, highly prospective land package that has barely been explored.  We are proud to engage with BBNC to responsibly explore for and develop mineral resources.  We look forward to performing systematic regional-scale exploration and making great discoveries on these lands.  We plan to share the risk of this exploration work by partnering with other exploration and mining companies”.

At the Kawisgag prospect, targets are immediately ready to drill.  There are two main centers of mineralization and alteration which locally contain disseminated and vein chalcopyrite, molybdenite and pyrite at surface.

The Mallard Duck Bay prospect is a zone of hydrothermal alteration covering an area greater than eight square km.  The zone has seen very limited exploration but mineralization appears to be associated with a diorite stock.  A strong chargeability anomaly coincident with exposed mineralization in a potassic alteration zone was identified by prior workers, but never drilled.

Mineralization at the Bee Creek prospect is hosted in hornfelsed sediments intruded by a multiphase diorite intrusive rock containing mineralized veins and disseminated chalcopyrite, molybdenite and pyrite.  A broad, central, potassic alteration zone bordered by a discontinuous halo of phyllic alteration is exposed at surface.  The prospect was initially explored by Bear Creek Mining with five drill holes in 1976.  In 2005 and 2006, Metallica Resources Inc. and Full Metal Minerals Ltd. carried out geochemical and geophysical surveys, and drilled two holes.  One of the holes intersected 118 m averaging 0.31% Cu, 0.009% Mo and 0.126 ppm Au with 20 m of 0.66% Cu and 0.255 ppm Au (see Full Metal Minerals news release dated October, 23, 2006 entitled “Full Metal and Metallica Encounter Copper Mineralization at Bee Creek” under their SEDAR profile, at www.SEDAR.com).  Mineralization, alteration and anomalous copper values in soils and rocks extend over a broad area at the Bee Creek prospect indicating the potential for a significant porphyry Cu-Mo-Au deposit near surface.  A qualified person has verified the data disclosed in this paragraph for Millrock.

In addition to these three known prospects, the region is prospective for porphyry copper-gold-molybdenum systems and other intrusive-related deposits such as polymetallic skarn and replacement deposits, base metal veins and epithermal gold deposits.  However, very little exploration has been done.  A more detailed description of the lands with maps can be viewed here.

The exploration agreement gives Millrock the right to explore for minerals on the mineral estate lands and, if terms are met, lease tracts of land for mining operations.  Much of the land package is split estate, with Alaska native village corporations owning the surface.  Millrock has made access agreements with two of these corporations.  In order to fulfill the exploration agreement terms, Millrock must incur exploration expenditures of US$5 million and pay US$725,000 prior to December 31, 2019.  The initial payment is $25,000 and the first-year exploration expenditure requirement is US$200,000.  Additionally, Millrock will make a BBNC Scholarship Foundation donation of US$10,000 annually.  Lease tracts of up to 7,500 acres will require an annual payment of US$200,000.  A sliding-scale Net Smelter Return (NSR) royalty is payable on gold (1.0% when gold is under US$1,000 (spot price per ounce), 1.5% when gold is under US$2,000 and 2.0% when gold is over US$2,000).  An NSR royalty of 1.0% is payable to BBNC on all other metals produced.

The technical information within this document has been reviewed and approved by Gregory A. Beischer, President & CEO of Millrock Resources Inc. Mr. Beischer is a qualified person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC.
Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class metallic mineral deposits in mineral rich Alaska and southwest USA, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has eleven active exploration projects, seven gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock projects that it will carry out exploration programs with a total value of more than US$5M in 2013.  Business partners of Millrock include some of the leading names in the mining industry: Teck, First Quantum and Altius.

FOR FURTHER INFORMATION, PLEASE CONTACT
Gregory A. Beischer, President & CEO
Phone: (604) 638-3164
Toll Free: (877) 217-8978

Millrock Resources Inc.
750 World Trade Centre - 999 Canada Place
Vancouver, BC  V6C 3E1
Canada

FORWARD LOOKING STATEMENTS
Some statements in this news release contain forward-looking information. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE."

Millrock Provides Exploration Update

VANCOUVER, BRITISH COLUMBIA, March 7, 2013 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock" or “the Company") is pleased to provide an update on its exploration activities. By continuing to rigorously following the Project Generator – Joint Venture business model, Millrock Resources remained very active throughout 2012, despite prolonged market uncertainty. Millrock’s 2012 exploration expenditures exceeded US$9M, 95% of which was funded by partner companies through earn-in option agreements.  By the end of 2012, Millrock had recovered 87% of all funds spent on exploration since inception of the Company by utilizing the Project Generator model.  Through 2012, Millrock also reached a number of other milestones it set out to achieve, including:

  • Completed drilling at five projects including Estelle, Council and Humble in Alaska and San Jose and Galiuro in Arizona.
  • Added one Alaska-based project to its portfolio, bringing the total number of properties to nineteen.
  • Formed option-to-joint venture agreements with Inmet Mining Corporation (TSX: IMN) ("Inmet"), on the Monsoon project in Arizona and Vale Exploration USA (“Vale”) on the AUDN project in Alaska.
  • Formed a joint venture with Teck American Incorporated ("Teck"), a subsidiary of Teck Resources Limited on the Estelle project in Alaska.
  • Closed a $2.2 million private placement and finished the year with approximately $3.8 million cash on hand.
  • Exploration expenditures totaled $9 million in 2012 and exploration cash recoveries totaled $8.6 million.

While 2013 is shaping up to be a year of reduced budgets in comparison with 2012, Millrock anticipates that its exploration expenditures will be approximately $5M, with $3.8M coming from its partners.  Despite a reduced exploration budget, there will remain plenty of catalysts for share price increase.

The sustained depressed market for junior explorers throughout 2012 and thus far in 2013, has created an opportunity for Millrock.  The Company is acquiring projects at low cost and is positioning for the time when markets improve and more venture capital funding is available.  With depressed prices, Millrock plans to continue building a portfolio of projects that attract the attention of major to mid-tier mining companies and junior explorers.

The following is an update of current projects:

Arizona:

Monsoon Project, copper porphyry target, Safford District, southeast Arizona: Partnering with Inmet, Millrock has carried out water well sampling to develop the target area.  Regional water well geochemical anomalies can occur near, but not necessarily directly above, large porphyry copper deposits, as is the case at Safford.  At Monsoon, strongly anomalous values of copper and molybdenum with porphyry pathfinder elements led Millrock to acquire a large tract of mineral rights in 2011.  Water well geochemical anomalies with coincident ZTEM and mag anomalies have been the focus of a recently completed surface soil geochemical survey and geological mapping.  It is expected that unconsolidated Quaternary sediments and Tertiary rock cover will be thick.  The mapping program was therefore designed to understand current and historic groundwater movement directions in order to best interpret the geochemical results.  During the soil geochemical survey 496 samples were collected and analyzed for pH and subjected to an ionic leach analytical method.  The method is well-suited to detecting porphyry deposits buried beneath thick cover and has been proven with several case studies.

Three distinct anomalous target areas have been identified from the geochemical, geophysical and geological surveys conducted to date.  To further understand the subsurface, particularly depth to basement rocks, historic seismic survey data has been acquired.  It is presently being processed and reinterpreted and additional seismic geophysical surveys may be carried out.  Upon receipt of seismic data results and interpretation, and integration into the project database, three specific targets may be selected and recommended to funding partner Inmet.

Inmet has the option to earn up to a 70% interest in the project by expending US$4.5M on exploration and paying $400,000 to Millrock.  Presently Inmet is earning in to the project and is bearing the exploration costs.  Millrock is the exploration operator.

The Monsoon project is situated along a projected southeastward extension of the prolific Safford trend.  Near Safford, Freeport McMoran Copper & Gold (“Freeport”) is mining a series of porphyry copper deposits.  Millrock’s claims are situated approximately 60 km to the southeast of Safford, Arizona in Greenlee Country near the Arizona - New Mexico border.

San Jose - Dry Mountain Project, copper porphyry target, Safford District, southeast Arizona: A third phase of drilling was carried out on the San Jose – Dry Mountain project late in 2012 with the Company’s partner on the project, Inmet. The three holes, which totaled 3,471 m, were drilled to test magnetic targets that have coincident geochemically anomalous signatures.  All holes intersected the favourable host Laramide age rocks beneath younger Tertiary cover rocks.  However, the rocks intersected were only weakly altered and contained only local, weakly anomalous copper values in one hole. As part of this exploration phase additional geochemical sampling was carried out.  Given these results, focus will now shift to the Dry Mountain target area.

Millrock is pleased to announce that Inmet has advised the Company that it wishes to exercise its option to form a joint venture on the project.  Upon receipt by Millrock of the final option payment of US$350,000 and a formal letter confirming the option exercise, Inmet will vest with a 70% joint venture interest in the project.  The joint venture management committee has approved a fourth phase of drilling to test a strong molybdenum-copper geochemical anomaly with a coincident magnetic anomaly that may represent porphyry-style mineralized intrusive rocks.  For the first test in this area, a single hole will be used, and possibly drilled up to 1,600 m depth.  Drilling is scheduled to commence as soon as possible.

The San Jose – Dry Mountain project is positioned at the intersection of the exceptionally prolific Safford and Morenci porphyry trends. The Safford deposits, which are presently being actively developed and mined by Freeport McMoran Copper & Gold, form a linear northwest striking trend. The San Jose project is located approximately six km from the Sanchez deposit at the southeast end of the Safford trend. Morenci is located approximately 30 km to the northeast and the Dry Mountain target is located upon an interpreted extension of the Morenci trend. Together, Safford and Morenci account for an enormous amount of past copper production and future reserves and resources. A porphyry cell located on Millrock's claims was discovered by drilling done by Noranda Inc. in the early 1990s.  (Note:  While the San Jose – Dry Mountain and Monsoon claims are situated along the linear trend defined by the Safford deposits Millrock does not own any interest in the Freeport deposits at Safford, nor does it imply that it will be successful in discovering similar deposits on its properties).

Alaska:

Estelle Project, reduced intrusion-related gold target, southwest Alaska: On September 10, 2012 Millrock announced results from the 2012 drilling program at the Estelle gold property located northwest of Anchorage, Alaska. Exploration drilling was done at the RPM, Oxide and West Wing prospects, three of the nine prospects occurring within the Estelle project area. Nine core holes totalling 1,379 meters were drilled as part of the 2012 program with all nine intersecting gold and/or copper mineralization. The exploration work was managed by Millrock on behalf of Teck. Teck (65%) and Millrock (35%) are joint venture partners on the project.

Of particular note were the results obtained at the Oxide Prospect where hole SE12-004 cut an interval averaging 1.14 g/t gold over 41.45 m from 30.79 to 72.24 m. Gold mineralization has now been drilled over a 740-m strike length and the system appears open in all directions. The grade appears to increase to the southeast where induced polarization surveys suggest increasing sulfide content.  The joint venture partners have decided to focus on this prospect in 2013.  The management committee has approved a budget of US$280,000 for additional induced polarization (IP) geophysical surveying, geological mapping and sampling.  The goal of the work is to better define the strong IP response that was detected in 2011 and partially drilled with hole SE-12-004.

Also of note was the result obtained in 2012 at the RPM prospect.  Hole SE12-008 cut an interval averaging 2.07 g/t gold over 21.94 m from 82.30 to 104.24 m occurring within a 102.11 m interval averaging 1.04 g/t gold from 26.52 to 128.63 meters.  This hole constitutes a new discovery of gold mineralization on the Estelle project.  However, due to budgetary constraints, there are currently no plans to further advance the project this year.

Humble Project, copper-gold porphyry target, southwest Alaska:  Millrock, along with funding partner Kinross Gold Corporation (“Kinross”), drilled a series of four holes.  Porphyry style alteration was intersected. Kinross has since dropped its option on the project and it is now available for option with new funding partners.  The project has a similar geological setting as that at the Pebble deposit, located 120 km to the northeast of Pebble.

Council Project, sediment-hosted vein gold target, western Alaska: As previously reported, Millrock, with funding partner Kinross, drilled a series nine holes which resulted in the discovery of a new gold zone at the Elkhorn prospect where an intersection of 1.45 g/t over 14.02 m was obtained.  However, the Company reports that Kinross has dropped its option on the claims.  The project is available for option with new funding partners.

Stellar Project, copper-gold skarn and porphyry target, central Alaska: Millrock has continued to review and assess the historical data that it purchased from prior exploration operators.  A NI 43-101 report was written by an independent consultant to Millrock (Eden, K. A., 2013, Stellar Property, Valdez Creek Mining District, South-Central Alaska: NI 43-101 Technical Report, January 8, 2013, 113 p.) and filed onSEDAR. The report concluded that the historical estimate of copper and gold present within the Zackly Main Skarn is not reliable, and re-drilling will be necessary to confirm the mineralization.  The project has generated strong interest from several potential partners and Millrock plans to show the project to these prospective partners in early June of 2013.

Project Generation:

Millrock is acquiring new claim groups by staking and by making agreements with underlying mineral right holders, increasing its portfolio of projects available for partnership with other companies.  The Company plans to announce these new acquisitions in the coming months as land positions are secured.

The technical information within this document has been reviewed and approved by Gregory A. Beischer, President & CEO of Millrock Resources Inc.  Mr. Beischer is a Qualified Person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC.
Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class gold and copper deposits in mineral rich Alaska and Southwest USA, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has eleven active exploration projects, seven gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock projects that it will carry out exploration programs with a total value of more than US$5M in 2013.  Business partners of Millrock include some of the leading names in the mining industry: Teck, Inmet and Altius.

FOR FURTHER INFORMATION, PLEASE CONTACT
Gregory A. Beischer, President & CEO
Phone: (604) 638-3164
Toll Free: (877) 217-8978

Millrock Resources Inc.
750 World Trade Centre - 999 Canada Place
Vancouver, BC  V6C 3E1
Canada

FORWARD LOOKING STATEMENTS
Some statements in this news release contain forward-looking information. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE."

Millrock Clarifies Previous Technical Disclosure

VANCOUVER, BRITISH COLUMBIA, March 1, 2013 - Millrock Resources Inc. (MRO – TSX-V) (“the Company”) reports that as a result of a review by the BC Securities Commission, the Company is issuing this news release to clarify previous technical disclosure.

Qualified Person: The Company did not include the name of the qualified person who approved, prepared or supervised the preparation of the technical information appearing in previous versions of the Company's website and in certain materials distributed by the Company, and the qualified person's relationship to the Company, as required by section 3.1 of NI 43-101.  The Company is correcting this omission.

Non-Compliant Historical Estimates:  In previous versions of its website and in other materials, the Company has used the terms "non 43-101 resource”, “resource potential” and “resource” to describe historical estimates in relation to its Stellar project (specifically to the “Zackly Skarn deposit” situated on the Stellar claims) and the Bluff project, Alaska, which is contrary to section 2.2 (a) and 2.3(1)(a) of NI 43-101.  Specifically the noted references do not meet the classification categories as defined in “CIM Definition Standards on Mineral Resources and Mineral Reserves”.  The Company also disclosed historical estimates for the Stellar and Bluff projects without providing all of the necessary additional information required by section 2.4 of NI 43-101.  Specifically, some of the Company’s materials did not mention the source and date of the historical estimate, comment on the relevance and reliability of the historical estimate, provide a statement on historical estimate resource categories used by the historical exploration companies and provide an explanation as to the difference with the CIM categories, and in the case of the Zackly Skarn deposit, reference and comparison to a more recent historical estimate.  The Company retracts any previous disclosures about the Stellar and Bluff project historical estimates and issues the following restatement:

For the Stellar project, which is host to the Zackly Skarn deposit, there are two historical resource estimates reported by prior exploration operators for the Zackly “Main Skarn”, one of three known mineralized skarn zones located along the Zackly skarn trend.  The historical estimates are shown in the tables below.  The historical estimates quoted from the 1987 and 1982 reports are for historical purposes only and are not compliant with CIM definition standards for Mineral Resources and Mineral Reserves, as defined under NI 43-101.  The historical reserve estimates were prepared prior to the implementation of NI 43-101 and use terminology different from and not compliant with current reporting standards, including the terms “indicated and inferred reserves” which incorrectly implies economic viability.  Reliability of the historical estimates reported in 1987 and 1982 is suspect based on poor recovery of the diamond core drilling and also the rotary drilling between 1981 and 1987 resulting in significant core and sample loss within areas of mineralization, together with selective sampling, wide drill spacing between sections and the lack of a QA/QC assay protocol (Eden, K. A., 2013, Stellar Property, Valdez Creek Mining District, South-Central Alaska: NI 43-101 Technical Report, January 8, 2013, 113 p.).   Though considered relevant by the Company, these historical estimates are not considered reliable.  Dr. Eden, a qualified person as defined in NI 43-101, has determined that it is not possible to use the historical estimates as current mineral resources or mineral reserves and the Company is therefore not treating the historical estimates as current mineral resources or mineral reserves.  He has determined that it will be necessary to re-drill the holes to verify the historical estimates and to upgrade the estimate to resources that are compliant with NI 43-101, as described in Dr. Eden’s technical report which was filed on SEDAR on January 8, 2013.  Dr. Eden is an independent consultant to the Company.

Zackly “Main Skarn”: 1987 Reserves*

CategoryShort TonsAu (oz/ton)Au ounces)Cu %Cu (million lbs)Ag (oz/ton)Ag (ounces)

None1,407,0000.132185,7242.1961.60.831,167,810

Zackly “Main Skarn”: 1982 Reserves**

CategoryShort TonsAu (oz/ton)Au (ounces)Cu %Cu (million lbs)Ag (oz/ton)Ag (ounces)

Indicated Reserves1,089,0000.176191,6642.6958.60.9561,041,084

Inferred Reserves155,0000.17627,2802.698.30.956148,180

*From Resource Associates of Alaska, 1987, 1987 Final Report: Exploration Results from Zackly Gold-Copper Skarn Prospect Alaska Range, Alaska Volume I, 141 p.  This study utilized a modified polygonal method based on data from core drill holes, reverse circulation drill holes and surface trenches.  Calculations were determined using a drill hole radius of influence of 200 feet and a 0.05 opt Au cutoff.  In 1986 metallic screen assaying methods were employed on available reject samples from the 1982 but not the 1981 Zackly drilling campaigns. A reference to a re-analysis of the 1982 estimate using these partial data is included in RAA, 1986, Zackly 1986 Report, Volume I, November, 1986, 38 p. The report introduction refers to “an indicated reserve of about 1 million tons of 0.19 opt gold and 2.7 percent copper”. The metallic screen data were not utilized in the 1987 study which constitutes the most recent reserve/resource study known to the Company.

** From UNC Teton Exploration Drilling, 1982, Geology of the Zackly Gold-Copper Skarn Prospect Alaska Range, Alaska Final Report 1982, 281 p.  The study utilized a modified polygonal method based on data from core drill holes and surface trenches.  The radius of influence for drill holes was half way to adjoining mineralization or 200 feet around an intercept.  Currently, the Company has access to the complete 1982 study only and was able to confirm and validate the data used.  As a result, the Company previously elected to report results from the 1982 report only.

For the Bluff Project, there is one historical estimate that was presented in a historical report using the term grade/tonnage potential which is:

Bluff 1991 Grade/Tonnage Potential

AreaShort TonsAu (oz per short ton)

Au (grams per tonne)

Ounces AuDaniels Creek3,000,0000.1

3.43

300,000Saddle Area1,500,0000.11

3.77

165,000Koyana Creek2,000,0000.02

0.69

  40,000

Total505,000

The “grade/tonnage potential” estimates in the table above for Bluff were excerpted from a report entitled BHP-Utah International, 1991, 1990 Bluff Gold Exploration Summary Report Part 1, Overview of Exploration Results 1986-1990 – Bluff Project Area Seward Peninsula, Alaska, BHP-Utah International Company Report, 5 p. The study utilized drill hole cross sections and best estimates for true width of mineralized zones.  Defined mineralized intervals were projected between sections along geologic trends.  The procedures used are also noted in Stevens, D. L., 2009, Bluff Gold Prospect, Seward Peninsula, Western Alaska, National Instrument 43-101 Technical Report, 21 p.

The grade/tonnage historical estimate for Bluff is not compliant with CIM definition standards for Mineral Resources and Mineral Reserves, as defined under NI 43-101.  The historical estimates were prepared prior to the implementation of NI 43-101 and use terminology not compliant with current reporting standards. The term “grade/tonnage potential” implies an inferred resource but is not correlative with CIM definitions and should not be taken as such.  Some detailed information, such as the number of drill holes used in the estimation, is unavailable.  In addition, little is known about the reliability of the BHP-Utah International drill program which did not appear to employ a QA/QC sample program.  Though believed to be relevant, for the reasons cited, the Company does not consider the Bluff historical estimate to be reliable.  Limited drilling by the Company in 2008 and 2010 confirmed the presence of gold mineralization at Bluff, however, the Company did not calculate a new resource estimate.  The historical estimate made by BHP-UTAH International in 1991 remains as the most recent estimate known to the Company.  A qualified person, Dr. Donald L. Stevens, an independent consultant to the company, has determined that it is not possible to classify the historical estimates as current mineral resources or mineral reserves (Stevens, D.L., 2009, Bluff Gold Prospect, Seward Peninsula, Alaska: National Instrument 43-101 Technical Report, June 5, 2009, 21 p. filed on SEDAR on October 1, 2009).  Therefore the Company is not treating the historical estimate as current mineral resources or mineral reserves.

Non-Compliant Disclosure of Mineral Resources – Other Deposits:  In certain materials the Company also discloses non-compliant resources for the Pebble, Whistler, Donlin Creek, Pogo and Fort Knox deposits, Alaska and the Safford and Resolution deposits, Arizona.  The Company wishes to clarify that it does not have any ownership interest in these deposits and it does not imply that it will be successful in discovering mineral deposits of similar tonnage and grade.  Additionally, in previous versions of its website and other materials, the Company did not disclose each category of mineral resources or mineral reserves for the Pebble project separately (contrary to section 2.2(b) of NI 43-101), added inferred mineral resources to other categories (contrary to section 2.2(c) of NI 43-101), and disclosed resources solely in the form of metal content (contrary to section 2.2(d) of NI 43-101).  The Company retracts the statements it has made that are contrary to NI 43-101.

Gregory A. Beischer, a director of the Company and its president and chief executive officer, is the qualified person (as defined in NI 43-101) who approved the technical information in this news release.

FOR FURTHER INFORMATION, PLEASE CONTACT
Gregory A. Beischer, President & CEO
Phone: (604) 638-3164
Toll Free: (877) 217-8978

Millrock Resources Inc.
750 World Trade Centre - 999 Canada Place
Vancouver, BC  V6C 3E1
Canada

FORWARD LOOKING STATEMENTS
Some statements in this news release contain forward-looking information. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include without limitation the completion of planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE."

Millrock Provides Update on Strategic Alliance with Vale: Five Porphyry Copper-Gold Projects Generated in Alaska

VANCOUVER, BRITISH COLUMBIA, December 20, 2012 - Millrock Resources Inc. (MRO - TSX-V) (“Millrock” or “the Company”) announced today that the strategic partnership between the Company and Vale Exploration USA, Inc., a wholly-owned subsidiary of Vale S.A. ("Vale"), has concluded.  Through the course of the program, Vale invested $1.4 million for research and reconnaissance exploration for porphyry copper-gold deposits in Alaska.  The work led to recommendations for five Designated Projects, one of which was accepted by Vale:  the AUDN project.  Under a separate budget Vale funded $700,000 for soil geochemical and ZTEM-magnetic airborne geophysical surveys at AUDN.  However, Vale has also advised that they will not fund further work on AUDN. Gregory Beischer, President & CEO of Millrock stated, “While Vale will not continue with the strategic partnership, we are pleased with what has been accomplished.  As a result of the work, Millrock has generated five highly prospective projects, two of which have been advanced to the drill-ready stage.  There is an excellent chance that we will find other partner companies to test the prospects we developed with Vale.”

ABOUT MILLROCK RESOURCES INC. Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class gold and copper deposits in mineral rich Alaska and Arizona, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has twelve active exploration projects, eight gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock plans to carry out exploration programs with a total value of more than US$10 million in 2012.  Business partners of Millrock include some of the leading names in the mining industry:  Kinross, Teck, Inmet and Altius.

ON BEHALF OF THE BOARD "Gregory Beischer” Gregory Beischer, President & CEO

FOR FURTHER INFORMATION PLEASE CONTACT: Gregory A. Beischer (604) 638-3164 Millrock Resources Inc. 750 World Trade Centre 999 Canada Place Vancouver, BC V6C 3E1

Some statements in this news release contain forward-looking information, including without limitation statements as the ability to confirm the presence of uranium deposits underlying the densely drilled areas of the property, the potential to expand resources by drilling, the forward-looking price of uranium, the potential for amenability to ISR mining, the ability to secure a funding partner for the project, the completion of the option to purchase some of the claims, and the ability to secure funding to carry out the planned exploration and development . These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”

Millrock Grants Stock Options

VANCOUVER, BRITISH COLUMBIA, November 15, 2012 - Millrock Resources Inc. (MRO – TSX.V) ("Millrock" or the "Company") has granted a total of 350,000 stock options under the Company’s stock option plan to a consultant.  The options are exercisable at $0.23 per share for a period of five years.

ABOUT MILLROCK RESOURCES INC. Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class gold and copper deposits in mineral rich Alaska and Arizona, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has twelve active exploration projects, eight gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock plans to carry out exploration programs with a total value of more than US$10 million in 2012.  Business partners of Millrock include some of the leading names in the mining industry:  Kinross, Teck, Vale, Inmet and Altius, as well as junior explorer Crescent Resources.

ON BEHALF OF THE BOARD "Gregory Beischer” Gregory Beischer, President & CEO

FOR FURTHER INFORMATION PLEASE CONTACT: Gregory A. Beischer (604) 638-3164 Millrock Resources Inc. 750 World Trade Centre 999 Canada Place Vancouver, BC V6C 3E1

Some statements in this news release contain forward-looking information, including without limitation statements as the ability to confirm the presence of uranium deposits underlying the densely drilled areas of the property, the potential to expand resources by drilling, the forward-looking price of uranium, the potential for amenability to ISR mining, the ability to secure a funding partner for the project, the completion of the option to purchase some of the claims, and the ability to secure funding to carry out the planned exploration and development . These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”

Millrock Announces Increase In Non-Brokered Private Placement

VANCOUVER, BRITISH COLUMBIA, October 30, 2012 – Millrock Resources Inc. (MRO – TSX:V) reports it has increased the non-brokered private placement announced on October 23, 2012.  The financing will now consist of up to 8,800,000 units at a price of $0.25 per unit for gross proceeds of up to $2,200,000.  Each unit shall consist of one common share of Millrock and one share purchase warrant (the “Warrants”), with each Warrant entitling the holder thereof to purchase one additional common share at a price of $0.35 per share for a period of three years from the closing date.  The increase was done in order to include a further investment from Altius Resources Inc. (“Altius”).  By virtue of the strategic alliance between the companies Altius has elected to exercise its anti-dilution right.  Additionally the financing has been increased to include one more strategic investor.

Finder’s fees of 7% cash and 7% finder’s warrants (“Finder’s Warrants”) may become payable in connection with this private placement.  The Finder’s Warrants will entitle the holder thereof to purchase units at an exercise price of $0.25 for a period of three years, the units having the same terms as described above.

Proceeds from the financing will be used for project marketing, generation of new projects and general corporate purposes. The financing is subject to approval from the TSX Venture Exchange.

ABOUT MILLROCK RESOURCES INC. Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class gold and copper deposits in mineral rich Alaska and Arizona, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has twelve active exploration projects, eight gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock is on track to carry out exploration programs with a total value of more than US$11 million in 2012.  Business partners of Millrock include some of the leading names in the mining industry:  Kinross, Teck, Vale, Inmet and Altius, as well as junior explorer Crescent Resources.

ON BEHALF OF THE BOARD "Gregory Beischer” Gregory Beischer, President & CEO

FOR FURTHER INFORMATION PLEASE CONTACT: Gregory A. Beischer (604) 638-3164 Millrock Resources Inc. 750 World Trade Centre 999 Canada Place Vancouver, BC V6C 3E1

Some statements in this news release contain forward-looking information, including without limitation statements as the ability to confirm the presence of uranium deposits underlying the densely drilled areas of the property, the potential to expand resources by drilling, the forward-looking price of uranium, the potential for amenability to ISR mining, the ability to secure a funding partner for the project, the completion of the option to purchase some of the claims, and the ability to secure funding to carry out the planned exploration and development . These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”

Millrock Announces Non-Brokered Private Placement

VANCOUVER, BRITISH COLUMBIA, October 23, 2012 – Millrock Resources Inc. (MRO – TSX:V) has arranged a non-brokered private placement with a small, strategic group of investors.  The financing will consist of up to 7,600,000 units at a price of $0.25 per unit for gross proceeds of up to $1,900,000.  Each unit shall consist of one common share of Millrock and one share purchase warrant (the “Warrants”), with each Warrant entitling the holder thereof to purchase one additional common share at a price of $0.35 per share for a period of three years from the closing date.

Finder’s fees of 7% cash and 7% finder’s warrants (“Finder’s Warrants”) may become payable in connection with this private placement.  The Finder’s Warrants will entitle the holder thereof to purchase units at an exercise price of $0.25 for a period of three years, the units having the same terms as described above.

Proceeds from the financing will be used for project marketing, generation of new projects and general corporate purposes. The financing is subject to approval from the TSX Venture Exchange.

ABOUT MILLROCK RESOURCES INC. Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class gold and copper deposits in mineral rich Alaska and Arizona, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has twelve active exploration projects, eight gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock is on track to carry out exploration programs with a total value of more than US$11 million in 2012.  Business partners of Millrock include some of the leading names in the mining industry:  Kinross, Teck, Vale, Inmet and Altius, as well as junior explorer Crescent Resources.

ON BEHALF OF THE BOARD "Gregory Beischer” Gregory Beischer, President & CEO

FOR FURTHER INFORMATION PLEASE CONTACT: Gregory A. Beischer (604) 638-3164 Millrock Resources Inc. 750 World Trade Centre 999 Canada Place Vancouver, BC V6C 3E1

Some statements in this news release contain forward-looking information, including without limitation statements as the ability to confirm the presence of uranium deposits underlying the densely drilled areas of the property, the potential to expand resources by drilling, the forward-looking price of uranium, the potential for amenability to ISR mining, the ability to secure a funding partner for the project, the completion of the option to purchase some of the claims, and the ability to secure funding to carry out the planned exploration and development . These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”

Millrock Discovers New Gold Zone at Council Project, Alaska

VANCOUVER, BRITISH COLUMBIA, October 10 2012 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock" or the "Company") announced today results from the 2012 drilling program at the Council gold property located west of Nome, Alaska.  Exploration drilling, done at the Elkhorn and Upper Ophir prospects, totaled 1,242 meters in nine core holes.  Kinross Gold Corporation (NYSE: KGC) (“Kinross”) is funding exploration under the terms of an option to joint venture agreement with Millrock operating.

Highlights

The 2012 Council project exploration program included core drilling at two prospects, Elkhorn and Upper Ophir. Results from the 2012 drill program include the following.

  • Elkhorn Prospect:  Hole COU12-023 cut an interval averaging 2.58 grams per tonne gold over 7.01 metersfrom 106.99 to 114.00 meters occurring within a 14.02 meter interval averaging 1.45 grams per tonne goldfrom 106.99 to 121.01 meters. This hole constitutes discovery of a new gold occurrence on the Council project.
  • Upper Ophir Prospect:  Hole COU12-025 cut an interval averaging 1.09 grams per tonne gold over 7.62meters from 38.40 to 46.02 meters.

Elkhorn Prospect The Elkhorn prospect occurs along a possible northwest-trending fault zone in schist and marble of the Nome Group. Previous soil sampling at Elkhorn defined a zone of anomalous gold and arsenic covering a 7.5 km strike length. The 2012 Elkhorn drilling consisted of seven core holes totaling 942 meters with four of the holes intersecting gold mineralization (see table below). Drilling occurred along widely-spaced drill fences within the central part of the anomaly over an area of approximately 1.5 km. Much of the anomalous trend remains untested and additional soil sampling with follow-up core drilling has been recommended to Kinross.

Upper Ophir Prospect The Upper Ophir prospect area geology consists primarily of schist and marble of the Nome Group, similar to that at Elkhorn. A large, strong arsenic anomaly was the focus of the drilling program which targeted a zone of graphitic schist overlying marble. Two core holes totaling 287 meters were drilled with both encountering encouraging gold mineralization (up to 7.62m grading 1.09 g/t Au).

The Council Project

Millrock has assembled a district-scale land package by staking claims and making option agreements with the Bering Straits Native Corporation and two prospectors.  The town of Council was built during the early 1900’s and was the nucleus of a prolific placer gold mining district that produced at least 300,000 ounces.

Bedrock geologic units in the Council area are primarily part of the Precambrian to Paleozoic, blueschist-facies metamorphosed Nome Group.  Bedrock gold mineralization is preferentially hosted in the more siliceous schist and quartzite units of the Mixed Unit with larger deposits occurring in shear structures and in brittle rocks.

Initial drilling at Council by Millrock was done in 2010 at the Albion prospect located west of the Upper Ophir prospect and northeast of the Elkhorn prospect. Drilling consisted of 17 shallow reverse circulation holes totaling 2,062 meters.  Two holes intersected > 1 g/t Au mineralization, confirming bedrock mineralization at the Albion prospect (see news release dated October 22, 2010 entitled “ Millrock and Kinross Report Results From Drill Program and Surface Geochemical Surveys at Council Gold Project, Alaska”).

Kinross can earn a 55% interest in properties secured in the Area of Interest by incurring US$3.0 million in exploration expenditures and paying Millrock a total of US$260,000.  Kinross may elect to increase its interest to 75% by making a further US$3.0 million exploration expenditure.  The agreement is presently in its third year.

Select 2012 Council composite intercepts (>0.50 g/t Au) are summarized in the table below.  Widths are reported as drill widths, not true widths, due to limited geological information in the area.

Prospect Hole ID From (m) To (m) Length (m) Au (g/t) Notes
Elkhorn COU12-018 31.85 39.93 8.08 0.90
Elkhorn COU12-019 141.73 142.95 1.22 23.80
Elkhorn COU12-020 No Significant Values
Elkhorn COU12-021 No Significant Values
Elkhorn COU12-022 135.94 137.16 1.22 0.68
Elkhorn COU12-023 88.69 93.57 4.88 0.65
including 92.35 93.57 1.22 1.98
COU12-023 106.99 121.01 14.02 1.45
including 106.99 114.00 7.01 2.58
Elkhorn COU12-024 No Significant Values
Upper Ophir COU12-025 38.40 46.02 7.62 1.09
including 45.23 46.02 0.79 8.61
Upper Ophir COU12-026 71.44 82.60 11.16 0.55
including 76.23 78.36 2.13 1.67

Note: Listed composites are those averaging >0.50 g/t Au calculated using a 0.200 gram/tonne Au cutoff with a maximum 3 meters internal dilution.

Location maps for the 2012 Council drill holes can be found at this link:  http://www.millrockresources.com/files/Location-Maps-Cross-Sections-2012-Council-Drilling.pdf

Notes The 2012 exploration drill program and sampling protocol has been reviewed, verified and compiled by Millrock's geologic staff. A rigorous QAQC protocol was used on the project, including insertion of blank, duplicate and standard reference samples per every 20 samples delivered to the assay lab. Because of concerns over coarse gold and the potential for gold loss during core handling and sampling, the entire drill core was sampled with each sample placed in a sealed bag. All samples were securely shipped to ALS Chemex Labs in Anchorage, Alaska for preparation, with fire assay and multi-element ICP analyses done at ALS Chemex Labs facility in Reno, Nevada. The drill core was carefully logged and photographed prior to sampling.

The technical information in this news release was reviewed by Gregory Beischer, Millrock's President and CEO, a Qualified Person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC. Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class gold and copper deposits in mineral rich Alaska and Arizona, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has twelve active exploration projects, eight gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock is on track to carry out exploration programs with a total value of more than US$11 million in 2012.  Business partners of Millrock include some of the leading names in the mining industry:  Kinross, Teck, Vale, Inmet and Altius, as well as junior explorer Crescent Resources.

ON BEHALF OF THE BOARD "Gregory Beischer” Gregory Beischer, President & CEO

FOR FURTHER INFORMATION PLEASE CONTACT: Gregory A. Beischer (604) 638-3164 Millrock Resources Inc. 750 World Trade Centre 999 Canada Place Vancouver, BC V6C 3E1

Some statements in this news release contain forward-looking information, including without limitation statements as the ability to confirm the presence of uranium deposits underlying the densely drilled areas of the property, the potential to expand resources by drilling, the forward-looking price of uranium, the potential for amenability to ISR mining, the ability to secure a funding partner for the project, the completion of the option to purchase some of the claims, and the ability to secure funding to carry out the planned exploration and development . These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”

Millrock Acquires Stellar Copper-Gold Project, Central Alaska

VANCOUVER, BRITISH COLUMBIA, September 19, 2012 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock" or the "Company") announced today that it has generated a new copper-gold project named Stellar. The project is located in central Alaska 13 km north of the Denali Highway and 68 km west of the town of Paxson. The property, which was acquired by staking, covers the Zackly copper-gold skarn deposit and surrounding lands considered prospective for porphyry copper-gold deposits. At Zackly, a historical resource of 218,944 ounces of gold and 66.9 million pounds of copper contained in a deposit of 1,244,000 tons (1,128,500 tonnes) grading 0.176 ounces per ton (6.03 grams per tonne) gold and 2.69 % copper has been reported by prior explorers (UNC Teton Exploration and Drilling Inc., 1982). (Note: A qualified person has not done sufficient work to classify the historical estimate as current mineral resources. The issuer is not treating the historical estimate as current mineral resources). Philip St. George, Millrock Chief Exploration Officer stated:  “We feel that the skarn resource can be readily expanded.  The favourable limestone-diorite contact can be traced hundreds of meters along strike in both directions from the resource area, and with the exception of the “main skarn zone”, has had limited drilling.  Additionally, there are indications that the gold grade may be significantly under-reported.  Outside of the previously defined skarn zones, we feel the project has significant potential for the discovery of a large copper-gold porphyry system.  Our exploration crews have discovered porphyry mineralization at surface that has not been drill tested and Millrock soil sampling has extended anomalous zones substantially.”

The Zackly skarn was originally staked by Resource Associates of Alaska (RAA) in the 1970’s with the majority of exploration campaigns occurring between 1981 and 1994. The most extensive exploration programs were conducted as part of several joint ventures between RAA/Nerco and Teton Exploration Drilling, Boulder Gold, Phelps Dodge and Hemlo Gold/Noranda.  Historical diamond and reverse circulation drilling on the skarn prospect totals approximately 40,000 ft (12,192 m) in approximately 85 holes.  Known areas of skarn mineralization occur over a strike length in excess of three km with the known resource occurring within the “main skarn zone” which has a strike length of approximately one km. The majority of the historical drilling occurred in the “main skarn zone” with the remaining trend, which includes extensive covered areas, seeing only limited drilling.  In addition to drilling, the property has seen extensive geochemical, geophysical and geological surveys. All historical data, as well as sample pulps and core, were recently obtained by Millrock in a purchase agreement.  Presently the Company is digitizing the information and bringing drill hole logs and analytical data into its Geographic Information System.

Millrock began staking claims in the area in 2010, subsequently adding claims in early 2011 and finally in August of this year bringing the total project area to an approximate 30,500 hectares (see figure here). Since 2010, Millrock has collected 388 soil, 199 rock and 99 stream sediment samples throughout the project area resulting in the discovery of at least four new copper and/or gold prospects. Of particular note is the Mars prospect, located approximately 10 km west of Zackly. This prospect consists of altered diorite intruding volcanic rocks with extensive gossan exposures that locally contain copper mineralization. Soil sample lines across altered zones consistently returned anomalous values including 950 meters averaging 763 ppm copper and 1.2 kilometers averaging 462 ppm copper.

Millrock considers the Stellar Project a highly prospective property with excellent exploration potential for the discovery of significant porphyry copper/gold, skarn and intrusive-related gold mineralization. Millrock, which has 100% ownership of the project subject to a royalty to Altius Minerals, is currently seeking a joint venture partner for the project. Additional information on the Stellar Project, as well as all of Millrock’s available properties is available at the Millrock Resources website.

The technical information in this news release was reviewed by Gregory Beischer, Millrock's President and Chief Executive Officer, a Qualified Person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC. Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class gold and copper deposits in mineral rich Alaska and Arizona, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has twelve active exploration projects, eight gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock plans to carry out exploration programs with a total value of more than US$11 million in 2012.  Business partners of Millrock include some of the leading names in the mining industry:  Kinross, Teck, Vale, Inmet and Altius, as well as junior explorer Crescent Resources.

ON BEHALF OF THE BOARD "Gregory Beischer” Gregory Beischer, President & CEO

FOR FURTHER INFORMATION PLEASE CONTACT: Gregory A. Beischer (604) 638-3164 Millrock Resources Inc. 750 World Trade Centre 999 Canada Place Vancouver, BC V6C 3E1

Some statements in this news release contain forward-looking information, including without limitation statements as the ability to confirm the presence of uranium deposits underlying the densely drilled areas of the property, the potential to expand resources by drilling, the forward-looking price of uranium, the potential for amenability to ISR mining, the ability to secure a funding partner for the project, the completion of the option to purchase some of the claims, and the ability to secure funding to carry out the planned exploration and development . These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”

Millrock Discovers New Gold Zone at Estelle Project, Alaska

VANCOUVER, BRITISH COLUMBIA, September 10, 2012 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock" or the "Company") announced today results from the 2012 drilling program at the Estelle gold property located northwest of Anchorage, Alaska.  Exploration drilling was done at the RPM, Oxide and West Wing prospects, three of the nine prospects occurring within the Estelle project area.  Nine core holes totaling 1,379 meters were drilled as part of the 2012 program with all nine intersecting gold and/or copper mineralization. The exploration work was managed by Millrock on behalf of Teck American Incorporated ("Teck "), a subsidiary of Teck Resources Limited.  Teck (55%) and Millrock (45%) are joint venture partners on the project.

Highlights

The 2012 program met its objective of discovering higher grade at the Oxide prospect and identified two new significant zones of gold mineralization at the RPM and West Wing prospects.

RPM Prospect:  Hole SE12-008 cut an interval averaging 2.07 grams per tonne gold over 21.94 meters from 82.30 to 104.24 meters occurring within a 102.11 meter interval averaging 1.04 grams per tonne gold from 26.52 to 128.63 meters. This hole constitutes a new discovery of gold mineralization on the Estelle project.

Oxide Prospect:  Hole SE12-004 cut an interval averaging 1.14 grams per tonne gold over 41.45 meters from 30.79 to 72.24 meters.  Gold mineralization has now been drilled over a 740-meter strike length and is open in all directions. Grade appears to increase to the southeast where induced polarization surveys suggest increasing sulfide content.

West Wing Prospect:  Hole SE12-007 cut an interval averaging 1.01 grams per tonne gold over 7.01 metersfrom 50.29 to 57.30 meters.  This newly discovered mineralization appears to be hosted by a shallow dipping diorite dike or sill.  Due to badly broken ground, drilling unfortunately failed to intersect the lower intrusive contact, which at surface appears to be more strongly mineralized.

RPM Prospect Geologic mapping in 2012 at the RPM Prospect has defined a broad zone of alteration in a high-level intrusive magmatic contact zone.  The single 2012 drill hole at RPM undercut sheeted quartz veins and stockworks exposed at surface.  The hole encountered significant gold mineralization with an intercept of 2.07 g/t Au over 21.94 meters within a 102.11 meter interval averaging 1.04 grams per tonne gold from 26.52 to 128.63 meters. Mineralization remains open in all directions. This new discovery is considered a priority target for follow-up.

Oxide Prospect At the Oxide Prospect, drilling in 2012 intersected multiple mineralized zones.  In three of the holes (SE12-002, 003, 004) the zones appear to occur along a rough northwest trend with veins exhibiting steep, near-vertical dips.  Mineralized zones up to 100 meters wide were encountered along this trend which now has a drilled strike length of 740 meters.  These holes were designed to follow up the Oxide discovery hole drilled in 2011 (see news release dated November 9, 2011 entitled “ Millrock Intersects Intrusion-Related Gold System at Estelle Project, Alaska”).  Anomalous gold mineralization was intersected over wide zones in all holes drilled.  The grade of mineralization, however, appears to increase to the southeast.  Hole SE12-004, the southeastern-most hole drilled, intersected gold mineralization throughout the majority of the hole with a highlight intercept of 41.45 meters grading 1.14 grams gold per tonne.  An induced polarization survey conducted in 2012 revealed a chargeability high corresponding with the drilled mineralized trend. The highest chargeability occurs southeast of drill hole SE12-004 providing a vector to possible higher-grade mineralization to the southeast.  This overburden covered area, with mineralization open both along strike and down dip, is considered a priority drill target.

West Wing Prospect Geologic mapping in 2012 at the West Wing Prospect has defined a zone of strong hydrothermal alteration surrounding a diorite sill.  At surface, copper, iron and arsenic sulfide mineralization with gold in quartz veins and veinlets appears to increase in intensity toward the lower contact of the sill.  Three holes were drilled in an attempt to pierce the sill and its lower contact.  However, due to badly broken rock, the light drill rig was incapable of reaching the necessary depth.  Nevertheless, anomalous gold values were returned in all three West Wing holes with a high of 1.01 grams per tonne gold over 7.01 meters.  Elevated copper values are also present in core from this prospect and range between 1000 and 4580 ppm Cu.  Evaluation of the 2012 West Wing exploration data is ongoing. Additional follow-up exploration work is recommended.

The Estelle Project Geologic features, and extensive surface geochemical anomalies at Estelle, indicate the potential for large, bulk-minable, reduced-intrusion-related or porphyry-style deposits.  To date, nine main areas of large-scale anomalous gold and pathfinder element geochemistry (Shoeshine, Shadow, Train, Oxide, RPM, West Wing, Portage, T5 and Stoney) have been identified within the 34,090 hectare Estelle Project.  The Estelle Project is adjacent to Kiska Metals Corp.'s Whistler copper-gold deposit and in the same assemblage of rocks that hosts Northern Dynasty/Anglo American's giant Pebble copper-gold-molybdenum-silver deposit.  During 2012, Teck fulfilled obligations to earn a 55% interest in the Estelle Project with Millrock retaining a 45% interest. Portions of the property are subject to a 3% NSR royalty payable to third parties.

Excellent progress was achieved in 2012 with follow-up drilling and continued evaluation of the numerous prospects within the project area anticipated for 2013.

Select 2012 Estelle composite intercepts (0.50 g/t Au) are summarized in the table below:

Prospect Hole ID From (m) To (m) Length (m) Au (g/t) Notes
Oxide SE12-001 Local anomalous Au values
Oxide SE12-002 46.33 67.36 21.03 0.65
SE12-002 75.29 78.33 3.04 0.62
99.67 113.08 13.41 0.69
includes 99.67 104.24 4.57 1.19
SE12-002 121.92 136.25 14.33 0.60
146.91 165.20 18.29 0.73
172.82 188.06 15.24 0.53
includes 172.82 176.94 4.12 1.43
Oxide SE12-003 Local anomalous Au values
Oxide SE12-004 30.79 72.24 41.45 1.14
99.36 101.80 2.44 0.89
105.77 121.01 15.24 0.50
127.41 168.25 40.84 0.57
includes 146.91 166.73 19.82 0.87
Oxide Ridge SE12-005 32.61 37.19 4.58 0.69
70.41 76.51 6.10 0.52
79.55 82.60 3.05 0.52
114.60 122.22 7.62 0.75
135.94 138.99 3.05 0.54
157.28 161.85 4.57 0.61
166.42 175.56 9.14 0.58
195.38 203.45 8.07 0.50
204.83 209.09 4.26 0.55
219.76 230.43 10.67 0.51
West Wing SE12-006 Local anomalous Au values
 
West Wing SE12-007 50.29 61.87 11.58 0.69
includes 50.29 57.30 7.01 1.01
SE12-007 75.29 76.51 1.22 1.20
RPM SE12-008 8.84 128.63 119.79 0.92  
includes 26.52 128.63 102.11 1.04  
includes 82.30 104.24 21.94 2.07  
includes 117.96 125.58 7.62 2.03  
SE12-008 135.79 139.60 3.81 0.65  
142.34 148.44 6.10 0.64
162.15 166.73 4.58 0.51
West Wing SE12-009 48.77 52.43 3.66 0.52

Note: Listed composites are those averaging >0.50 g/t Au calculated using a 0.20 g/t Au cutoff with a maximum 3 meters internal dilution

Location maps and cross sections for the 2012 Estelle drill holes can be found at this link: http://www.millrockresources.com/presentations/estelle_presentation/

Notes True widths for the Oxide prospect drill holes are estimated at 0.707 of the intercept length based on a northwest-trending, steeply-dipping mineralized zone.  Currently, there is insufficient information to determine true widths for the RPM and West Wing drill intercepts.

The 2012 exploration drill program and sampling protocol has been reviewed, verified and compiled by Millrock's geologic staff.  A rigorous QAQC protocol was used on the project, including insertion of blank, duplicate and standard reference samples per every 20 samples delivered to the assay lab.  Drill cores were split lengthwise and half of the core was collected as a sample and placed in a sealed bag.  All drill core samples were securely shipped to ALS Chemex Labs in Anchorage, Alaska for preparation, with fire assay and multi-element ICP analyses done at ALS Chemex Labs facility in Reno, Nevada.

The technical information in this news release was reviewed by Gregory Beischer, Millrock's President and Chief Executive Officer, a Qualified Person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC. Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class gold and copper deposits in mineral rich Alaska and Arizona, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has twelve active exploration projects, eight gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock plans to carry out exploration programs with a total value of more than US$11 million in 2012.  Business partners of Millrock include some of the leading names in the mining industry:  Kinross, Teck, Vale, Inmet and Altius, as well as junior explorer Crescent Resources.

ON BEHALF OF THE BOARD "Gregory Beischer” Gregory Beischer, President & CEO

FOR FURTHER INFORMATION PLEASE CONTACT: Gregory A. Beischer (604) 638-3164 Millrock Resources Inc. 750 World Trade Centre 999 Canada Place Vancouver, BC V6C 3E1

Some statements in this news release contain forward-looking information, including without limitation statements as the ability to confirm the presence of uranium deposits underlying the densely drilled areas of the property, the potential to expand resources by drilling, the forward-looking price of uranium, the potential for amenability to ISR mining, the ability to secure a funding partner for the project, the completion of the option to purchase some of the claims, and the ability to secure funding to carry out the planned exploration and development . These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”

Millrock Commences Drilling on San Jose Project, Safford Copper District, Arizona

VANCOUVER, BRITISH COLUMBIA, August 1, 2012 - Millrock Resources Inc. (TSX-V: MRO) ("Millrock" or the "Company") is pleased to announce that a third phase of drilling has begun on the San Jose project in the Safford District of Arizona. The drilling program will consist of three holes totaling approximately 3,300 m. The holes will be drilled to test geological - magnetic survey targets that may represent porphyry-style mineralized intrusive rocks.

The San Jose project is positioned at the intersection of the exceptionally prolific Safford and Morenci porphyry trends. The Safford deposits, presently being actively developed by Freeport McMoran Copper & Gold, form a linear northwest striking trend. The San Jose project is located approximately six km from the Sanchez deposit at the southeast end of the Safford trend. Morenci is located approximately 30 km to the northeast. Together, Safford and Morenci account for approximately 10 billion tons of past copper production and future reserves and resources. A porphyry cell located on Millrock's claims was discovered by drilling done by Noranda Inc. in the early 1990s. Drilling in the current program will focus on targets northeast of the San Jose porphyry.

The project is the subject of an exploration and option agreement with Inmet Mining Corporation (TSX: IMN) ("Inmet"). Under the terms of the Agreement Inmet has the opportunity to earn a 70% interest by incurring US$4.0 million in exploration expenditures and by making option payments of US$750,000.

The technical information in this news release was reviewed by Gregory Beischer, Millrock's President and CEO, a Qualified Person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC. Millrock Resources Inc. is a premier project generator to the mining industry. In the search for world-class gold and copper deposits in mineral rich Alaska and Arizona, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies. Millrock currently has twelve active exploration projects, eight gold-copper properties in Alaska, and four porphyry copper prospects in Arizona. With funding primarily coming from its joint venture partners, Millrock plans to carry out exploration programs with a total value of more than US$11 million in 2012. Business partners of Millrock include some of the leading names in the mining industry: Kinross, Teck, Vale, Inmet and Altius, as well as junior explorer Crescent Resources.

ON BEHALF OF THE BOARD "Gregory Beischer” Gregory Beischer, President & CEO

FOR FURTHER INFORMATION PLEASE CONTACT: Gregory A. Beischer (604) 638-3164 Millrock Resources Inc. 750 World Trade Centre 999 Canada Place Vancouver, BC V6C 3E1

Some statements in this news release contain forward-looking information, including without limitation statements as the ability to confirm the presence of uranium deposits underlying the densely drilled areas of the property, the potential to expand resources by drilling, the forward-looking price of uranium, the potential for amenability to ISR mining, the ability to secure a funding partner for the project, the completion of the option to purchase some of the claims, and the ability to secure funding to carry out the planned exploration and development . These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”

Millrock Begins Drilling at Council Gold Project, Seward Peninsula, Alaska

VANCOUVER, BRITISH COLUMBIA, July 24, 2012 - Millrock Resources Inc. (MRO - TSX:V) ("Millrock" or the "Company") announced that drilling has commenced at the Council project on the Seward Peninsula in western Alaska. Exploration at the Council project targets sediment-hosted vein gold deposits. The planned program for this project consists of six holes totaling approximately 1,000 m. Drill holes will test a seven km long gold – arsenic soil anomaly that overlies a regional structural feature. In places, the soil anomaly is up to 400 m in width. Millrock crews discovered stockwork and vein hosted gold mineralization near the target area in 2011. Placer gold occurrences are known to exist downstream.

The Council project is the subject of an option to joint venture agreement with Kinross Gold Corporation (KGC - NYSE) ("Kinross"). Under the terms of the agreement, Kinross may earn up to a 75% interest in the project.

The technical information in this news release was reviewed by Gregory Beischer, Millrock's President and CEO, a Qualified Person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC. Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class gold and copper deposits in mineral rich Alaska and Arizona, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has twelve active exploration projects, eight gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock plans to carry out exploration programs with a total value of more than US$10 million in 2012.  Business partners of Millrock include some of the leading names in the mining industry:  Kinross, Teck, Vale, Inmet and Altius, as well as junior explorer Crescent Resources.

ON BEHALF OF THE BOARD "Gregory Beischer” Gregory Beischer, President & CEO

FOR FURTHER INFORMATION PLEASE CONTACT: Gregory A. Beischer (604) 638-3164 Millrock Resources Inc. 750 World Trade Centre 999 Canada Place Vancouver, BC V6C 3E1

Some statements in this news release contain forward-looking information, including without limitation statements as the ability to confirm the presence of uranium deposits underlying the densely drilled areas of the property, the potential to expand resources by drilling, the forward-looking price of uranium, the potential for amenability to ISR mining, the ability to secure a funding partner for the project, the completion of the option to purchase some of the claims, and the ability to secure funding to carry out the planned exploration and development . These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”

Millrock Commences Drilling Program at Estelle Gold Project, Alaska

VANCOUVER, BRITISH COLUMBIA, July 9, 2012 - Millrock Resources Inc. (MRO - TSX:V) ("Millrock" or the "Company") announced today that drilling has commenced at the Estelle Gold Project in Alaska.  The project is a joint venture between Millrock (45%) and Teck American Incorporated ("Teck") (55%), a subsidiary of Teck Resources Limited.  The Estelle gold project is located northwest of Anchorage, Alaska. The drilling program now underway is planned to consist of seven holes totaling approximately 1,500 m.  Five of the planned holes will be drilled at the Oxide Ridge occurrence where Millrock intersected a thick, low grade gold intersection during its 2011 drilling program.  At this location, Millrock previously discovered a multi-element soil geochemical anomaly in a roughly circular area measuring two km in diameter.  As announced on November 9, 2011, hole SE-001 intersected variably altered magmatic intrusive rock with quartz veins and stockworks containing gold mineralization over the entire length of the hole.  Most of the mineralization was found from depths of 31.8 m to 397.1 m and returned a weighted average of 0.43 g/t Au over 365.3 m. Two more holes will be used to test geochemical anomalies in pyritic rocks on the margin of an intrusion at the RPM showing located at the south end of the claim block.

The target sought at Estelle is a gold deposit of the Intrusion-Related type.  Geologic features, and extensive surface geochemical anomalies indicate the potential for large, bulk-minable, deposits.  Four main zones of large-scale anomalous gold and pathfinder element geochemistry have been identified over the past three years:  Shoeshine, Oxide Ridge, RPM and Stoney.  At the Shoeshine and Oxide Ridge prospects surface mineralization is spatially associated with porphyritic intrusive rocks, quartz stockworks and hydrothermal breccias.  At RPM rusty, pyritic hornfels sediments with anomalous gold indicate a possible auriferous intrusion at a shallow burial level.  The Stoney prospect is a high-grade, polymetallic vein occurrence.

Many of the claims that comprise the property are subject to a 3.0% NSR royalty payable to third parties.  The claims are located approximately 160 km northwest of Anchorage, Alaska.  The property is adjacent to Kiska Metals Corp.'s Whistler copper-gold deposit.  Estelle is located in the Kahiltna Terrane, an assemblage of rocks that hosts Northern Dynasty/Anglo American's giant Pebble copper-gold-molybdenum-silver deposit.

Millrock's 45% share of the 2012 exploration program is estimated to cost approximately US$800,000.  Under the terms of a loan agreement with Teck, Millrock will borrow up to the entire amount necessary to cover its share of the planned program costs.  The loan, which bears a 6% interest rate, may be repaid by December 31, 2012, and if Millrock does so, it will retain its 45% interest.  Millrock may elect not to repay the loan, and if it does not, its interest in the Estelle project will be reduced in accordance with the dilution formula contained in the joint venture agreement.  If the planned program is carried out, and Millrock does not repay the loan, its equity interest in the project would be reduced to approximately 35%.

The technical information in this news release was reviewed by Gregory Beischer, Millrock's President and CEO, a Qualified Person as defined in NI 43-101.

ABOUT MILLROCK RESOURCES INC. Millrock Resources Inc. is a premier project generator to the mining industry.  In the search for world-class gold and copper deposits in mineral rich Alaska and Arizona, Millrock identifies, packages and operates large-scale projects for joint venture, thereby exposing its shareholders to the benefits of mineral discovery without the usual financial risk and attendant shareholder dilution taken on by most exploration companies.  Millrock currently has twelve active exploration projects, eight gold-copper properties in Alaska, and four porphyry copper prospects in Arizona.  With funding primarily coming from its joint venture partners, Millrock plans to carry out exploration programs with a total value of more than US$10 million in 2012.  Business partners of Millrock include some of the leading names in the mining industry:  Kinross, Teck, Vale, Inmet and Altius, as well as junior explorer Crescent Resources.

ON BEHALF OF THE BOARD "Gregory Beischer” Gregory Beischer, President & CEO

FOR FURTHER INFORMATION PLEASE CONTACT: Gregory A. Beischer (604) 638-3164 Millrock Resources Inc. 750 World Trade Centre 999 Canada Place Vancouver, BC V6C 3E1

Some statements in this news release contain forward-looking information, including without limitation statements as the ability to confirm the presence of uranium deposits underlying the densely drilled areas of the property, the potential to expand resources by drilling, the forward-looking price of uranium, the potential for amenability to ISR mining, the ability to secure a funding partner for the project, the completion of the option to purchase some of the claims, and the ability to secure funding to carry out the planned exploration and development . These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements.

"NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.”